For a pair overhead trolley, need 2 bolts and nuts, 2 H-attachments or 1 I-attachment.
For a load bar assembled, need 2 pairs overhead trolley, 4 bolts and nuts, 2 B-attachments, 2 spherical washer, 2 bushes, 2 castle nuts and 2 cotters.
网络文化经营许可证:浙网文[2013]0268-027号|增值电信业务经营许可证:浙B2-20080224-1 2007-2024 Tradevv.com. All rights reserved.