On enclosed track conveyors, typical lube time settings are around 10 to 15 milliseconds. Monorail and formed track conveyors require more because of the greater bearing surface to be covered, usually somewhere in the 15 to 25 millisecond range. Depending on various factors, these settings may be higher or lower, but it is not recommended to go below 8 milliseconds to insure proper solenoid operation
网络文化经营许可证:浙网文[2013]0268-027号|增值电信业务经营许可证:浙B2-20080224-1 2007-2024 Tradevv.com. All rights reserved.